WORK HAS BEGUN
Magnificent new real estate development
Your apartment in the heart of the village of Pomy
The building will consist of 6 apartments of 4. 5 rooms, distributed on 3 levels and served by a lift.
Apartment of 4. 5 rooms (LOT A1) on the ground floor, south-west orientation comprising:
- Entrance hall with built-in wardrobe
- Kitchen of 9m2 open to living room
- Stay of 36. 8m2
- A bedroom of 14m2
- A room of 11. 4m2
- A room of 10. 3m2
- A bathroom of 5. 4m2
- A powder room of 3. 1m2
- Two terraces of 8m2 each
A cellar and a space for a private washing machine dryer in the laundry room complete this property.
A parking space in the basement as well as two outdoor spaces in addition to the price (Price of the 3 seats: CHF 65,000. -).
Traditional village architecture, meticulous construction, underfloor heat pump heating, photovoltaic panels are the technologies used for this construction.
The finishing touches of the apartment will be done at the discretion of the tenant.
Transfer taxes are considerably reduced because they are calculated on the land share
Delivery: around the end of 2025
Don't hesitate, take the plunge and ask for the complete file
Magnificent new real estate development
Your apartment in the heart of the village of Pomy
The building will consist of 6 apartments of 4. 5 rooms, distributed on 3 levels and served by a lift.
Apartment of 4. 5 rooms (LOT A1) on the ground floor, south-west orientation comprising:
- Entrance hall with built-in wardrobe
- Kitchen of 9m2 open to living room
- Stay of 36. 8m2
- A bedroom of 14m2
- A room of 11. 4m2
- A room of 10. 3m2
- A bathroom of 5. 4m2
- A powder room of 3. 1m2
- Two terraces of 8m2 each
A cellar and a space for a private washing machine dryer in the laundry room complete this property.
A parking space in the basement as well as two outdoor spaces in addition to the price (Price of the 3 seats: CHF 65,000. -).
Traditional village architecture, meticulous construction, underfloor heat pump heating, photovoltaic panels are the technologies used for this construction.
The finishing touches of the apartment will be done at the discretion of the tenant.
Transfer taxes are considerably reduced because they are calculated on the land share
Delivery: around the end of 2025
Don't hesitate, take the plunge and ask for the complete file